53000M3 excavation solid stone site (5300m2 depth 12m).
Raft foundation (1.4m deep by 5300m2).
Concrete Frame Building, 40,000m2 (3 underground Parking Flrs, 6 Above ground commercial flrs).
30 Months construction duration. (2005-2007).